Monday, December 26, 2005

Projected Project List:


Only Two Major Structural Issues That We Are Aware Of Now:

1. The keel seems to have a slight list and the keel bolts need replacement. We will remove and re-bed the keel and replace the bolts.

2. Over time the pressure of the mast has caused the top of the cabin to sag a bit, so the reinforcing stringer inside will have to be strengthened or replaced.

0 Comments:

Post a Comment

<< Home